Some of Our Completed Projects

Explore some of our completed HVAC projects across Nigeria, delivered with precision, quality equipment and a commitment to customer satisfaction.

Access Bank, Oniru, Lagos

Project Scope: Supply and installation of a Daikin VRV air-conditioning system, including ventilation.

Equipment Type: Daikin VRV system; concealed ducted units, ceiling cassette units, wall-mounted units and fresh-air units.

Equipment Capacity: Approximately 600 kW total cooling capacity.

Glendale Workspace, Ikoyi Plaza, Ikoyi, Lagos

Scope: Installation of an LG VRF air-conditioning system, split AC units and ventilation.

Equipment Type: LG VRF system with ceiling cassette units; Hisense split air conditioners; ventilation units.

Equipment Capacity: VRF system — 87.6 kW; 50 units of 1.5 HP Hisense split ACs.

Providus Bank, Ikate

Scope: Installation of an LG VRF air-conditioning system, split AC units and ventilation.

Equipment Type: LG VRF system with concealed ducted units, ceiling cassette units and wall-mounted units; LG split ACs; ventilation units.

Equipment Capacity: VRF system — approximately 300 kW; 14 units of 1.5 HP LG split ACs.

Location: Ikate, Lagos State, Nigeria.

Supreme Court of Nigeria and Federal High Court

Scope: HVAC design for the Main Hall of the Supreme Court and associated areas, including the Federal High Court project.

Equipment Type: VRF air-conditioning system; ceiling-concealed units (CCUs) and fresh-air handling units (FAHUs).

Equipment Capacity: Main Hall — 336 kW; other areas — 160 kW; total — 496 kW.

Location: Supreme Court Main Hall, Abuja, Nigeria.

Evans Industries Ltd.

Scope: Installation of a chiller system and air-handling units (AHUs) serving the production hall and cutting area.

Equipment Type: York twin chillers and three AHUs.

Equipment Capacity: 2 AHUs at 15,280 L/s each. 1 AHU at 6,055 L/s.

Total AHU airflow: 36,615 L/s.

Chiller cooling capacity: 220Tons of Refrigerant.

Location: Acme Crescent, Ikeja, Lagos State, Nigeria.

The Avenue Suites VI, Lagos

Scope: Installation of a new chiller, associated system modifications and remodelling works.

Equipment Type: Chiller plant and fan coil units (FCUs).

Equipment Capacity: 7 FCUs; chiller capacity of 200Tons of Refrigerant.

Location: Opposite Eko Atlantic, Victoria Island, Lagos, Nigeria.

Vision Suites

Scope: Deployment of a VRF air-conditioning system for guest rooms and public areas.

Equipment Type: LG VRF system with low-static-pressure concealed units for guest rooms and high-static-pressure concealed units for public areas, including conference rooms, reception and back-of-house (BOH) areas.

Equipment Capacity: 75 guest rooms. Total cooling capacity = 300kW 

Location: Uyo, Akwa Ibom State, Nigeria.

Akure Mall

Scope: Design and installation of rooftop packaged air-conditioning units serving six cinema halls.

Equipment Type: Rooftop packaged air-conditioning units.

Equipment Capacity: 90 TR total across six cinema halls.

Location: Akure, Ondo State, Nigeria.

 

Jumat Mosque, Ogbomosho

Scope: Design and installation of air-conditioning systems for the mosque.

Equipment Type: Hisense ceiling-concealed air-conditioning units.

Equipment Capacity: 11 units, each rated at 5 HP.

Location: Ogbomosho, Oyo State, Nigeria.

Let's work on your next HVAC project